NEW QUESTION 108
Accounts receivable turnover is calculated by dividing net credit sales by:

 
 
 
 

NEW QUESTION 109
How do freight costs affect the inventory of a retailer?

 
 
 
 

NEW QUESTION 110
Which of the following is a major benefit of enterprise resource planning systems?

 
 
 
 

NEW QUESTION 111
A maintenance superintendent (manager) has just joined the company and has read the company’s statement of strategic direction in which it says. “Our most important goal is to increase the return on capital investment in our plants (facilities). All management incentive compensation will be reflected in the achievement of this goal” The new superintendent (manager) has asked the plant (facility) manager for a copy of the plan to achieve the company’s goal The plant (facility) manager explains that such a plan does not exist, nor is there time to do one. The best next step for the superintendent (manager) should be to:

 
 
 
 

NEW QUESTION 112
(%) = [Corrective Work Identified as Rework (hours) ÷ Total Maintenance Labor Hours] ×
100

 
 
 
 

NEW QUESTION 113
What relationship should Maintenance and Reliability Teams have with and suppliers for optimum effectiveness?

 
 
 
 

NEW QUESTION 114
(%) = (Corrective Maintenance Hours × 100) ÷ Total Maintenance Labor Hours

 
 
 
 

NEW QUESTION 115
The maintenance function should be viewed in value added terms and should be associated with profit and the optimization of maintenance costs. When developing the maintenance budget, it is important to:

 
 
 
 

NEW QUESTION 116
The amount of time an asset is actively producing a product or providing a service. It is the actual running time. → Uptime

 
 

NEW QUESTION 117
The maintenance manager of a bearing manufacturer has asked you to calculate the reorder point of a spare part item. She has provided you with the following information to facilitate your calculations. The cost of the spare parties$100. The cost of earning inventory is 20% of the cost of the part. The cost of placing an order is$40 for which the annual demand is 100,000 units. The average tad-time for replenishment is two weeks and the buffer stock of 500 units S desired and the average inventory is 100 units per week. What is the reorder point in units for this spare part?

 
 
 
 
 

NEW QUESTION 118
The rate at which an asset actually produces product during a designated time period.

 
 
 
 

NEW QUESTION 119
Utilization Time % × Availability % × Performance Efficiency % × Quality Rate
% → Total Effective Equipment Performance (TEEP)

 
 

NEW QUESTION 120
corrective work done on previously maintained equipment that has prematurely failed due to maintenance, operations or material problems

 
 
 
 

NEW QUESTION 121
The degree to which the equipment operates at historical best speeds, rates, and/or cycle times

 
 
 
 

NEW QUESTION 122
The metric is the average downtime required to restore an asset or component to its full operational capabilities. MDT includes the time from failure to restoration of an asset or component.

 
 
 
 

NEW QUESTION 123
probability that an item, when used under design conditions in an operational environment, will perform satisfactorily. It includes active repair time, preventive maintenance time and administrative and logistic delays and represents the availability that is actually experienced → Limiting Availability

 
 