4.7/5 - (3 votes)

Go to 1Z0-1066-21 Questions – Try 1Z0-1066-21 dumps pdf

Dumps Practice Exam Questions Study Guide for the 1Z0-1066-21 Exam

Oracle 1Z0-1066-21 Exam Syllabus Topics:

Topic Details
Topic 1
  • Apply Item Attributes for Supply Planning
  • Managing Sourcing and Approved Suppliers
Topic 2
  • Deploying Multi-Dimensional Demand Segments
  • Describe Override Demand Forecast and Plan Approval
Topic 3
  • Manage Release Recommendations
  • Evaluate and Execute Simulations
  • Contract Management Collaboration
Topic 4
  • Create and Manage a Constrained Supply Plan, including Material and Resource Constraints
  • Configure, Run and Manage a Demand Plan
Topic 5
  • Configure Attribute-Based Planning
  • Applying Forecasting Methods, Causal Factors, and then Evaluating Results
Topic 6
  • Configure Safety Stock Plan options
  • Configure Replenishment Planning
Topic 7
  • Manage Creating, Copying and Viewing a Supply Plan
  • Oracle Planning Central Cloud Overview
Topic 8
  • Configure Production Scheduling
  • Sales and Operations Planning
  • Explain Supply Network Model

 

NO.43 Another planner has previously created a supply plan, but you now need to make some changes so that you can do some ‘what-if’ analysis. How can you go about duplicating this plan?

 
 
 
 
 

NO.44 In order for Supply and Demand Plans to run successfully, which three Configure Planning Analytic tasks must be completed? (Choose three.)

 
 
 
 
 
 

NO.45 Which is the proper fulfillment strategy to plan for supply using the appropriate lead times required for processing material at a third party, based on the manufacturing work definition?

 
 
 
 
 

NO.46 You are running a demand plan for the first time and you want to generate forecast for the next six months.
Which two demand plans run options should be selected? (Choose two.)

 
 
 
 
 

NO.47 Your client has reviewed all of the current graphs available for the plans, but cannot find one that shows them exactly what they want for the Days ofSupply. How can this key performance indicator be added?

 
 
 
 
 

NO.48 A sales order containing a back-to-back item has been created. However, when you ran the supply plan in Planning Central, the supplyfor the sales order was not released. Why was the supply not released?

 
 
 
 

NO.49 You are viewing a drop shipment plan for your organization and you want to know which customer the purchase order will be shipped to. Where can you seethat?

 
 
 
 
 

NO.50 You have executed Planning Data Collection and want to confirm that data has successfully been collected.
Identify the three data combinations that can be viewed using the Maintain Supply Network Model Page.
(Choose three.)

 
 
 
 
 

NO.51 Your current shipments forecast for Jan 2018 is 1000 and the demand planner determines that the forecast should be 1500. Describe how the demand planner can override shipments forecast. Also, what happens to the final shipments forecast measure when the demand plan is run again and the shipments forecast value changes to 1250?

 
 
 
 

NO.52 During an implementation, customer is in the process of planning supply requirements. Customer also needs to generate forecast and safety stock levels. Which plan type on the plan options should the customer be running?

 
 
 
 
 

NO.53 Your client wants to exclude all of the inventory from the ‘Reject’ subinventory from only one of their supply plans. What action must be taken to meet this requirement?

 
 
 
 
 

NO.54 Demand is high leading up to the Christmas holiday every year between Dec 20 and Dec 24 and not on Christmas day (Dec 25). Your customer has two demand plans. Describe the steps to model Christmas causal factor in both demand plans.

 
 
 
 
 
 

NO.55 Demand planner opens the pre-seeded plan summary of the demand plan and wants to analyze the forecast results. Describe the steps to review andanalyze the forecast results.

 
 
 
 

NO.56 Which two statements are true when using Measure catalogs? (Choose two.)

 
 
 
 
 
 

NO.57 You ran a demand plan and you are reviewing the shipments forecast value measure. It is always zero for a particular item. Identify the root cause of this problem.

 
 
 
 

Free Supply Chain Planning Cloud 1Z0-1066-21 Exam Question: https://www.braindumpstudy.com/1Z0-1066-21_braindumps.html

         

Related Links: www.stes.tyc.edu.tw www.stes.tyc.edu.tw myportal.utt.edu.tt www.stes.tyc.edu.tw zenwriting.net www.stes.tyc.edu.tw