Q32. Thermal imaging infrared cameras can be used to help find which of the following system operational issues?

 
 
 
 

Q33. An installer is hired to troubleshoot a 10-year-old roottop system with open-circuitvoltage of 300V. The ground-fault detection (GFD) device has tripped. The insulation on the exposed source circuit cables has deterlorated with multiple cracks and has no flexibility. Which concern is the MOST likely safely issue when servicing this array?

 
 
 
 

Q34. Which of the following is an NEC requirement regarding access for large-scale PV electric power production facilities?

 
 
 
 

Q35. An installer is using 1/2 in lag boits to secure roof-monitoring hardware to rafters through a roof deck. Which of the following should the installer predrill?

 
 
 
 

Q36. A PV array with 58 in. X 38 in modules in portrait orientation is to be mounted at a 35 tiit angle on a shingle roof that has a 5:12 pitch. Assuming the support leg is attached to the top of the modules and is perpendicular to its face, what is the length of the support leg for the modules?

 
 
 
 

Q37. A customer has a 200A service with a 200A rated panel and 200A main breaker located on the street side of the house. There is a 100A breaker located at the opposite end of busbar feeding a 125A subpanel in the backyard. The customer would like to place the inverter the backyard and use the 125 subpanel. Which MAXIMUM inverter(s) output circuit current could be installed?

 
 
 
 

Q38. A residential PV system uses two 120.240Vac utility-interactive inverters with a sealed lead-acid battery energy backup for protected loads. The MOST important protected load consideration when operating in the backup mode is that:

 
 
 
 

Q39. Which electrical connection requires the use of a torque device to complete the connection per NEC requirements?

 
 
 
 

Q40. Which of the following tests measures axial uplift whenperforming load testing of driven-pile foundation members

 
 
 
 

Q41. An 8KWsc roof-mounted array is placed on a school building. The inverter is located within 1 ft, of the array boundary and has an integrated ac-and dc-disconnecting switch. The system is to be connected to a 400A load center, protected by a 400A main breaker. Which of the following MUST be included to meet NEC requirements?

 
 
 
 

Q42. According to the NEC, where on a residential PV system MUST the labeling describing the type of rapid shutdown be located?

 
 
 
 

Q43. When running horizontal 1-1/4 in, electrical metallic tubing (EMT) with compression fittings, what is the MAXIMUM permissible distance between condult supports?

 
 
 
 

Q44. A commercial 600v carport-mounted PV system is installed with rigid running under the parking lot to an inverter pad located at the edge of the parking lot. At what depth below the parkinglot base MUST condult be buried?

 
 
 
 

Q45. Which of the following should a PV installer do during dc insulation resistance testing?

 
 
 
 

Q46. A7KW/ 14 KWh multimode systemhas been installed at a residence, ac-couple with the customer’s existing
6.7kwh ac PV system. The system providers uninterrupted power to a protect loads subpanel, which is connected to a refrigerator, Microwave, 1.0 ton are conditioner, three lightning circuit, and the 6.7kwac PV system. One month later, the homeowner moves additional circuits to the protected loads subpanel, substantially increasing the loads. Why would this cause, the backfed interconnection breaker in the main service panel to trip?

 
 
 
 

Q47. A PV system equipped with rapid shutdown requires a label stating ”RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM”.
Which is the BEST description of where this label is required?

 
 
 
 

Q48. An installer has decided to use 31 in. long. 3.1/2 in diameter conical ground screws as the footings for a
3.840W solar electric system. Access to he is too difficult to pour concrete footings. The soll is classified as sandy loam. The design wind speed is 90 mph with an uplift force of 32 ibs/ft2. What is the MINIMUM number of screw required to resist uplift loads?

 
 
 
 