NO.66 A customer intends to build out their VDI environment over a period of 18 months. They require a consistent user experience as the numbers grow.
What element of the Nutanix WebScale architecture would a systems engineer discuss with them?

 
 
 
 

NO.67 A customer recently deployed Nutanix for VDI workloads and determine AFS is suitable for their departmental shares. They ask about infrastructure requirements providing the following file workloads specifics:
* 11.8 TB of data.
* 360000 files.
* 2400 Users.
* 800 shares.
Based on the exhibit,

which criteria shared by customer supports the requirement of additional nodes?

 
 
 
 

NO.68 A VDI environment based on AHV Cluster is not performing well. The current environment is using only one bridge (BridgeO). An administrator need to verify if nodes are using all network card associated to BridgeO. Which two menus should be used to check the current configuration? (Choose two.)

 
 
 
 

NO.69 A prospect provides the following details for sizing active working set based on their existing server virtualization environment:
Full backup reports:
January: 10TB
February: 11TB
March: 12TB
April: 13TB
May: 14TB
Average Read/Write Ratio – 75/25
When entering a Raw Input in Sizer, what should the SE use as the minimum amount of required SSD Storage?

 
 
 
 

NO.70 Refer to Exhibit.

When entering a Raw Input workload into Sizer, what amount of RAM should be used for the entire workload?

 
 
 
 

NO.71 An SE needs to leverage Change Block Tracking when using Xtract to migrate VMs from ESXi to AHV.
Which two source VM requirements should the SE verify? (Choose two)

 
 
 
 

NO.72 what information can be gathered about the configuration of the VM storage?

 
 
 
 

NO.73 Which method can be used to migrate a VM configured for UEFI-boot from a Nutanix Hyper-V cluster to AHV?

 
 
 
 

NO.74 AN SE determines that a POC is necessary to overcome competitive FUD in an opportunity with an Enterprise account evaluating several HCI solutions. The customer will evaluate three solutions in their datacenter simultaneously over the course of 4 days.
The customer schedules all necessary personnel to be available during this time.
Which two network planning items should the SE determine prior to allocation hardware for the POC?
(Choose two)

 
 
 
 
 

NO.75 When creating a multi-cluster scenario in Sizer, what does the Summary Failover Capacity indicator (N+0, N+1) display?

 
 
 
 

NO.76 Using the Sizing Options shown, which two configurations are possible configurations that Sizer could provide in Automatic mode? (Choose two)

 
 
 
 

NO.77 A customer has deployed Nutanix with Esxi for VDI workloads and is considering Nutanix for a major server virtualization project. The customer is running z/Virtual Machine today for a mission critical workload and would like to consider Nutanix as a potential platform.
Which reason would currently disqualify this prospect as an opportunity?

 
 
 
 

NO.78 An online retailer currently supports over 200 separate PostgreSQL database instances, often with more than
10 copies of each Individual database. Their Database Administrators have scripted much of the deployment process for creating dev/test copies, but dies infrastructure team struggles to keep up with storage capacity demands.
Which Nutanix product should the systems engineer position?

 
 
 
 

NO.79 What is the main function of Oplog?

 
 
 
 

NO.80 A customer is evaluating Nutanix to replace their existing 200TB filer. The filer is used to store archived images. To achieve maximum storage density. RF2 and Erasure Coding are proposed. What is the minimum number of nodes required to support the maximum Erasure Coding stripe size of 4/1 (data/parity)?

 
 
 
 

NO.81 An SE is meeting with a prospect that is refreshing infrastructure in 100 retail locations. Currently the stores use vSphere hosts connected to direct attached storage and are managed by 6 separate vCenter servers. On-site retail staff is unqualified to deal with any hardware break/fix issues.
Which two aspects of Nutanix solution should the SE highlight? (Choose two)

 
 
 
 

NO.82 An administrator is deploying several new application VMs to a Nutanix Cluster. The application is very transactional with a 28/72 random, read/write ratio. What should the administrator do?

 
 
 
 

NO.83 A prospective customer wants to migrate database workloads to Nutanix. They are currently running these workloads on a 3-tier vSphere architecture made up of 5 hosts connected to a hybrid SAN over 10G iSCSI. The hosts each have 256G RAM and 2 Broadwell 2.8Ghz 12 core processors. The largest database VM is configured with 64G of memory. Some databases are fairly old and single threaded Current performance is deemed acceptable. Which configuration component is most important to maintain the customer experience on a new Nutanix cluster and minimize costs ?

 
 
 
 

NO.84 How long must data be ‘write-cold’ before Erasure Coding can begin optimization?

 
 
 
 