To pass the Nokia 4A0-265 exam, candidates will need to demonstrate their ability to identify and troubleshoot various types of optical network problems, including signal degradation, fiber attenuation, and transmission errors. They will also be expected to understand common optical testing methods, such as power meter and optical time-domain reflectometry (OTDR) testing, and be able to interpret test results accurately.

 

NO.20 Which of the following issues can cause a “Loss too low” message to be displayed after a power adjustment has been provided?

 
 
 
 

NO.21 Which of the following CLI commands displays a list of the expected and measured output power for the channels whose admin state is up?

 
 
 
 

NO.22 Which of the following statements correctly describes where power adjustments can be performed?

 
 
 
 

NO.23 Which of the following statements best describes the payload type setting?

 
 
 
 

NO.24 Which of the following statements best describes the output of the command: show xc 1?

 
 
 
 

NO.25 A “Power Adjustment Required” alarm was raised on the ingress amplifier in slot 1/10. Which of the following commands should be entered to manually adjust the related amplifier optical power levels?

 
 
 
 

NO.26 Suppose a channel-related alarm is reported on an 1830 PSS node, and is related to a possible Wave Keys clock source issue. What is the recommended order for the following troubleshooting steps?

 
 
 
 

NO.27 On a bidirectional optical amplifier configuration, which of the following are Wavelength Tracker detection points?

 
 
 
 

NO.28 Consider the exhibit. A single directional fiber cut is occurring between two amplifiers in unidirectional configuration with Raman pump.
Multiple services are crossing the affected span.
Which node(s) will report an Incoming Payload LOS” alarm?

 
 
 
 

NO.29 Suppose a unidirectional amplifier has been plugged into slot 1/13. Which command should the user enter to retrieve the OSC pluggable module type?

 
 
 
 

NO.30 When troubleshooting possible generic fiber cuts, the recommended first step is to: 1. Review alarms at nodes where power loss occurs.
What is the next recommended step?

 
 
 
 

NO.31 A power adjustment has succeeded conditionally because of gain settings set to higher levels than expected by design. Which of the following alarms will raise?

 
 
 
 

NO.32 Which of the following statements about optical power vs amplification stages is TRUE?

 
 
 
 

NO.33 Consider the exhibit. Given the following power readings, what is the calculated span loss from Node A to Node B?

 
 
 
 

NO.34 What is the typical severity level of a “Loss of Signal” (LOS) alarm?

 
 
 
 

NO.35 Suppose a node is experiencing a little unexpected attenuation over the Optical Supervisory Channel (OSC) transmit direction. Which of the following statements is FALSE?

 
 
 
 