MB-320 Dumps for Microsoft Dynamics 365 Certified Exam Questions and Answer

The MB-320 exam is designed to test the candidate’s knowledge and skills in various areas of manufacturing, including production planning and control, product information management, and inventory management. MB-320 exam covers topics such as creating and managing bills of materials, configuring product variants, managing inventory, and generating reports. MB-320 exam also evaluates the candidate’s ability to use Microsoft Dynamics 365 Supply Chain Management to optimize production processes, improve supply chain visibility, and increase operational efficiency.

 

Q33. You need to resolve the shop supervisor’s issue.
Which options should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Q34. You need to configure production control parameters for liquid cleaning solution manufacturing.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.

 
 
 
 

Q35. A company wants to account for the time to set up a machine to manufacture a new part.
You need to set up the costing calculations in the system.
Which three calculation group warnings can you set up? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.

 
 
 
 
 

Q36. You are building the Bill of materials (BOM) for a new production item. The new item has a subcomponent.
Subproduction orders for the subcomponent must be created when estimating production orders.
You need to configure the BOM line to generate subproduction orders.
Which BOM line type should you use?

 
 
 
 

Q37. A customer produces light projection toys for holiday decorations throughout the year.
You must implement Bills of material (BOMs) for the product lifecycle. The solution must meet the following requirements:

You need to create a BOM for each phase.
Which BOM types should you use? To answer, select the appropriate configuration options in the answer area.
NOTE: Each correct selection is worth one point.

Q38. A chemical manufacturing company uses Dynamics 365 for Finance and Operations. A batch of material has a quality issue and must be reworked.
You need to create the rework order the production.
Which three options must be set? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

 
 
 
 
 

Q39. A company sells large batches of chemicals. Item specifications vary from batch to batch.
You must fulfill multiple orders from the same batch of chemicals. If a single batch cannot be reserved, manual reservation must be used. The system must also make reservations based on the earliest batch receipt date.
You need to set up a new chemical item that automatically uses the new batch reservation logic.
Which three settings should you configure? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

 
 
 
 
 

Q40. You need to configure system attributes.
Which attribute types should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Q41. You work for a gem wholesaler that sells raw diamonds. Diamonds are purchased and sold in individual boxes but weighed and inventoried in carats.
You are setting up a catch weight item for diamonds. Each box of diamonds must be tracked by its individual container weight.
You need to set up this item as a full visibility catch weight item.
Which two steps must you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

 
 
 
 

Q42. A company uses Dynamics 365 Process manufacturing.
Employees work a half day so that they can attend a company event. You have a rush order that must be completed that same day.
After reviewing the net requirements of the batch order, only 400 of the total quantity of 1400 units must be completed today. The production manager must retain the original batch number as the quantity of 400. The original batch number must appear on documentation for the customer.
You need to split the batch order into two orders.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Q43. A manufacturer sends wiring harnesses to a vendor to be soldered to a connector. You have created the subcontracting process in the bill of materials (BOM) and route to account for the items sent to the vendor.
You create separate subcontracting purchase orders to account for the service. You attempt to add the service item to the BOM. The system generates an error.
You need to set up a new item model group for the service item.
Which three actions should you perform? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Q44. Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean processes. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
* Create a vendor resource and work cell for outsourced painting; add the vendor resource to the work cell.
* Create a production flow process activity using the painting work cell and the service item for picking.
* When the service is required, create a purchase order to the subcontracting vendor and add a line for the service item and the vendor price.
Does the solution meet the goal?

 
 

Q45. A company uses Dynamos J65 Supply Chat Management.
The marketing group needs to be able to view a manufacturer’s suggested retail price (MSRP) (or a new bill of materials (BOM) item when the cost of the BOM item is calculated.
You need to configure the functionality.
What should you do?

 
 
 
 
 

Q46. A company sells large batches of chemicals. Item specifications vary from batch to batch.
You must fulfill multiple orders from the same batch of chemicals. If a single batch cannot be reserved, manual reservation must be used. The system must also make reservations based on the earliest batch receipt date.
You need to set up a new chemical item that automatically uses the new batch reservation logic.
Which three settings should you configure? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

 
 
 
 
 

Q47. A company produces homeopathic lotions for pain relief. The lotions use a combination of ProductA and ProductB. ProductA is the primary ingredient. You use ProductB to adjust the concentration of active ingredients in the lotion.
You need to ensure that the lotion final product has a consistent concentration of anti-inflammatory agents.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

 
 
 
 
 

Q48. A company that uses discreet manufacturing concepts to produce solar panels has a temporary change of glass supplier. The substitute glass will only be used for three months. The company also uses Bill of materials (BOM) version to track changes of the raw materials.
Managers are manually adjusting the production picking lists to reflect the alternate glass that is being temporarily used. The time spent doing manual adjustments to production picking lists has become a burden.
You need to create a new BOM with the alternate glass and include a from and to date on the BOM version.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Q49. You are a functional consultant for Contoso Entertainment System USA (USMF).
You need to configure the system to ensure that a production release to a warehouse only occurs when the complete list of required components for a product is physically available.
To complete this task, sign in to Dynamics 365 portal.

Q50. A company overstates on-hand raw materials due to the time it takes to post raw materials as consumed when production orders are processed.
All items used to manufacture finished goods must be consumed when a finished good is reported as finished.
You must not change all bill of materials lines to use the option of flushing principal.
You need to ensure that all production orders consume raw materials at Report as finished.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Q51. A company uses separate finished good item numbers for size variations of the same product.
The company wants to minimize the number of variously-sized items that are created.
You need to perform the setup to allow variants in size to the product master.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Q52. A manufacturing company is implementing Dynamics 365 Supply Cham Management.
Bill of materials (BOMs) must be calculated using standard cost principles.
Miscellaneous charges must be included in the unit cost price. The explosion mode must arways be enforced as single level.
You need to configure the system to meet the requirements.
Which configuration should you enable for each requirement? To answer, drag the appropriate configurations to the correct requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Q53. You are the quality assurance manager of a pharmaceuticals company.
One of your customers has requested to only receive batches of item B0001 that have an acid concentration between 5.5% -10.5%.
You need to set up the customer specific batch attribute to track percent acid for B0001.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Q54. A company uses Process manufacturing.
You need to review formulas and how the different ingredient types impact the batch balancing process.
Which ingredient types should you use? To answer, drag the appropriate ingredient types to the correct scenarios. Each ingredient may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Q55. A manufacturing plant uses Lean manufacturing. Operators process Kanban consumption manually by using a mobile device.
The production team must use automatic empty registration for some of the event Kanbans. Registration must occur when the last job of a Kanban is completed.
You need to update the Kanban rule to meet this requirement.
What Kanban setting should you update?

 
 
 
 

Use Real MB-320 Dumps – 100% Free MB-320 Exam Dumps: https://www.braindumpstudy.com/MB-320_braindumps.html

         